The 4x5 Project Blog
Written by: | Posted on: | Category:

I replaced the half broken halogen lamps in my darkroom with nice LED ones and installed a drying rack for my 4x5 negatives in the shower.
Ah, and I found a used fridge in the right size a few weeks ago. (It's on the very left with the Halloween sign on the front.)

Thursday January 20th, 2022
Prev
Wednesday October 27th, 2021
Next